Thursday, May 29, 2008

Tile, tile, and more tile

CSC_8890
The tile is all up. With the exception of the glass mosaics in the shower (ran out of grout), all of the tile in the bathroom is done. Just need to let the grout dry for 4 days and then I can start sealing all the tile. The bathroom is probably a little more modern than what we had thought but oh well.


CSC_8891

Friday, May 23, 2008

Lauren's first SUV/Wagon

DSC_8743
For my first birthday I thought we were getting a new SUV with a big bow on top. This isn't quite what I had in mind but at least it has 4 cupholders and seats that fold flat for maximum storage.

Tuesday, May 20, 2008

Let the tiling begin

DSC_8818
After repairing some spots in the kerdi and cutting all of the 18" x 18" limestone tiles in half, the tile is all ready to go.

Tippy toes

DSC_8621

Monday, May 19, 2008

I'm 12 months old now!

DSC_8781
So you want me to hold onto this string and not the bear? Why? What happens if I....

DSC_8788
Uh oh.

DSC_8790

Thursday, May 01, 2008

Orange wallpaper

DSC_8352
The drawers are too close to the wall, so I had to cut the end off so that it will clear the door trim. Here's the wood after a table saw.

DSC_8356
Here's my nicely sanded and rounded edges. Just need to stain them and put them back on.

IMG_3265
Here's the drain and shower pan kit. The rails are presloped so you know exactly how to slope the concrete. Unfortunately the hole around the drain wasn't large enough so this kit is sitting on top of the concrete base. This means the shower pan is going to be an inch thicker than it should be. I didn't realize this until the tile guy had already poured most of the concrete.

IMG_3291
Here's the orange wallpaper. This is actually a waterproofing membrane called Kerdi. It goes on with thinset and then the tile goes on top of it. The whole shower is covered in this including the ceiling. I just hope the kerdi on the ceiling has enough strength to hold the tile.