
Here's a picture of the Terk directional antenna we are using to pick up HD over the air. The antenna works pretty well but then again we are only 2 miles from the TV towers. Check out www.antennaweb.org to find the towers near you.
A random collection of things

Here's a picture of the Terk directional antenna we are using to pick up HD over the air. The antenna works pretty well but then again we are only 2 miles from the TV towers. Check out www.antennaweb.org to find the towers near you.
Okay so after resisting years and years and succumbing to the Tivo hype, we finally broke down and got it. Well actually Santa delivered it from South Africa with the lifetime service no less. So is it really worth a few hundred dollars to not have to remember to program the VCR or wait till the show is done to watch it from the beginning? In one word, YES! I think the coolest feature about it though is being able to play Eric's MP3 collection on the Stereo. There's this SW, galleon tv, that runs on your PC that enhances a lot of Tivo's home networking features. So if you've been resisting Tivo, I recommend getting one or waiting for the HD Tivo Series 3 that was demo'ed at CES this year.
Here's what the area looked like before. 
So our dining room table and chairs finally came in from Ethan Allen. Everything is coming together for the holidays. Overall the finish of the table matches the buffet table pretty well which is from Crate and Barrel.
Here's a shot fo the Peacock cushions. It'll go well when we finally paint one of the walls red.Here's our other recent purchases, an armless sectional and coffee table from PB. We also have a leather slipper chair but there's no room for it with the tree up.
You were probably thinking I was talking about our kitchen but this time its our Douglas Fir Christmas Tree. Here it's getting a nice trim before being loaded on the car.
So after a few hrs of decorating etc. the tree has finally made its way to its final resting place. Hopefully the cats won't knock too many ornaments off.
Well all of the kitchen work is being put on hold during the holidays. Luckily they were able to finish up some items like installing the dishwasher. They finished installing the hardware and installed the glass on the upper cabs as well as the wall plates. They also made the trim by the wine cooler sturdier but that needed fixing. Keep reading for that one.
Here's the dishwasher. Overall it's a lot quieter than our old one but still a little noiser than what we expected. The model is the S series which we had changed to the U series since those are quieter but unfortunately the S series showed up. So instead of waiting another 2 wks or so for a U series dishwasher, we went ahead and installed this one.
Here's the end cabinet with the glass installed now.
So what you are looking at here is my handy work for securing the trim. Originally the workers had placed that extra bracing piece and secured it with liquid nails but the adhesive didn't hold it and it fell down. So instead I screwed that piece into the trim and then down into the block holding the lower trim. Then to hold the lower trim in place, I screwed the brace and the lower trim piece as well. Overall it's a lot more secure than what was there before.
Also, here I put extra tile down to level out the area so that the wine fridge could slide in and out very easily. Since I didn't have a tile cutter, I had to get creative with a hammer. Really they should have cut the tile and put thinset down to secure them but time was ticking in order for them to finish on Wed.
Okay so the wine cooler has finally been installed. The trim piece to the right had to be altered to add a toe kick. Now the fridge is flush with the cabinet door. Now we just have to fill it. Charles Shaw anyone?
Here the glass door for the island book case is being mounted to the door frame. Hopefully the glass for the upper cabinet doors will be the right size this time.
Some of the earlier tile work had to be ripped up again because they didn't put in the base molding first. You can see the unfinished molding.
Here's some minor touchup on the ceiling. Hopefully tomorrow the tile will be grouted and the dishwasher will be installed.
Well after 4 weeks we finally have lights in the kitchen again. Overall the lights are much better than the track lighting they replaced but we probably should have positioned them a little better. Oh well.
So besides the lights, most of the hardware was installed. We can finally start moving stuff back into the kitchen. The glass came for the upper cabinets but somehow they measured the openings wrong and the glass didn't fit. Also, the reeds in the glass were horizontal instead of vertical. Hopefully those will be in by next week as well.
Finally after about 4 weeks, we have water in our kitchen sink. You can see our new Grohe faucet, air vacuum switch for the garbage disposal, and soap dispenser.
If you look closely, you can see our new appliance garage to hide things in. There's just one problem with it though.
Our appliances are just a tad too tall for it. Hopefully they'll be able to work something out so they fit.
Here you can see they fixed the microwave opening by moving one of the cabinets. 30" on the dot.
Here's our backsplash tile. We removed some of the outlier tiles that are part of what makes natural stone so "beautiful".
Finally the granite is installed. Luckily they didn't break any of the slabs because we didn't have any spares.
We are still missing most of our appliances as well as plumbing. Hopefully those will roll in next week.
In case you were wondering how they cut your sink holes. It helps to have the right drill bit.
Since the overhang is more than 12", they recommend extra support. Originally these bars should have been routed into the subdeck, but for some reason no bars were present in the subdeck or the granite. So our kitchen contractor found these after a quick trip to home depot. It's not the most attractive but only little kids will be able to see them. Hopefully no one's knees hit them either.
Here's a shot of them attaching the granite to the subdeck. The white spots are just latex caulk and if you look closely there are these plastic spaces to make the surface level. Overall most of our granite is only touching the subdeck in a few places.
If you guessed number 3, then you were right. Here's a picture of Mango Coax Nuage by LBL Lighting.
Can you tell what's missing? The phone jack has been moved into the cabinet in case anyone needs it. Who actually uses a landline these days anyways. Other things finished today were the island outlet, the 4 outlets under the sink, and some touch ups on the molding. Granite is tomorrow.

A fresh coat of paint where the soffits use to be.
Too bad these cabinets will have to move slightly.
A shot of the undercabinet lights. Each one is 10 watts.
Here's the transformer (300W) mounted under the sink.


