The work kind of stalled the last two weeks with a flurry of activity the day before and after Christmas. Here you can see the framing for the shower and the air tub. You can also see my handiwork with the recessed lights over the tub. The glass block windows were knocked out and smaller windows were framed in. The exterior was also stuccoed.
Here you can see the rough plumbing installed although not completed. We have a thermostatic valve with 3 volume controls above. These will control the shower head, hand shower, and rain head.
They needed to move the drain and increase the size so they took a sledgehammer to the foundation. They also plan on piping hot water from the tub area since it's 3/4 inch versus 1/2 inch pipe.