Friday, December 23, 2005

Early Xmas gifts

So our dining room table and chairs finally came in from Ethan Allen. Everything is coming together for the holidays. Overall the finish of the table matches the buffet table pretty well which is from Crate and Barrel.

Here's a shot fo the Peacock cushions. It'll go well when we finally paint one of the walls red.


Here's our other recent purchases, an armless sectional and coffee table from PB. We also have a leather slipper chair but there's no room for it with the tree up.

Thursday, December 22, 2005

Just in time for Xmas

You were probably thinking I was talking about our kitchen but this time its our Douglas Fir Christmas Tree. Here it's getting a nice trim before being loaded on the car.


So after a few hrs of decorating etc. the tree has finally made its way to its final resting place. Hopefully the cats won't knock too many ornaments off.



Day 28. Dishwasher and more handy work

Well all of the kitchen work is being put on hold during the holidays. Luckily they were able to finish up some items like installing the dishwasher. They finished installing the hardware and installed the glass on the upper cabs as well as the wall plates. They also made the trim by the wine cooler sturdier but that needed fixing. Keep reading for that one.

Here's the dishwasher. Overall it's a lot quieter than our old one but still a little noiser than what we expected. The model is the S series which we had changed to the U series since those are quieter but unfortunately the S series showed up. So instead of waiting another 2 wks or so for a U series dishwasher, we went ahead and installed this one.


Here's the end cabinet with the glass installed now.


So what you are looking at here is my handy work for securing the trim. Originally the workers had placed that extra bracing piece and secured it with liquid nails but the adhesive didn't hold it and it fell down. So instead I screwed that piece into the trim and then down into the block holding the lower trim. Then to hold the lower trim in place, I screwed the brace and the lower trim piece as well. Overall it's a lot more secure than what was there before.


Also, here I put extra tile down to level out the area so that the wine fridge could slide in and out very easily. Since I didn't have a tile cutter, I had to get creative with a hammer. Really they should have cut the tile and put thinset down to secure them but time was ticking in order for them to finish on Wed.

Monday, December 19, 2005

Day 26. Wine anyone?

Okay so the wine cooler has finally been installed. The trim piece to the right had to be altered to add a toe kick. Now the fridge is flush with the cabinet door. Now we just have to fill it. Charles Shaw anyone?

Here the glass door for the island book case is being mounted to the door frame. Hopefully the glass for the upper cabinet doors will be the right size this time.


Some of the earlier tile work had to be ripped up again because they didn't put in the base molding first. You can see the unfinished molding.


Here's some minor touchup on the ceiling. Hopefully tomorrow the tile will be grouted and the dishwasher will be installed.

Saturday, December 17, 2005

Day 25. All Done....well almost

Well today was the day in which everything was supposed to be completed. Due to some unfortunate circumstances with the contractors, they were short one man. As a result, our kitchen has a few things that still need to be completed which hopefully most of which will be completed early next week. A few things such as cabinet trim and the appliance garage might take a little longer.

Well after 4 weeks we finally have lights in the kitchen again. Overall the lights are much better than the track lighting they replaced but we probably should have positioned them a little better. Oh well.
So besides the lights, most of the hardware was installed. We can finally start moving stuff back into the kitchen. The glass came for the upper cabinets but somehow they measured the openings wrong and the glass didn't fit. Also, the reeds in the glass were horizontal instead of vertical. Hopefully those will be in by next week as well.

Since they were a man down, I helped install the dimmer switches. I installed dimmers for the pendant, undercab, and recessed lights. Even after installing a dimmer for magnetic transformers, the transformer still hums.

Thursday, December 15, 2005

Day 23. Appliances


Grout was added to the tile backsplash.



The appliances were finally installed. Now we can finally cook again after eating out for almost a month.

Tuesday, December 13, 2005

Day 22. Tile

Here's the tile backsplash minus the grout. It's a 3 x 6 beveled edge travertine.

If you look carefully, you'll notice the appliance garage is missing. A new one has been ordered and this time should be installed properly so that the appliances actually fit under the door.

Monday, December 12, 2005

Day 21. Can I have some water?

Finally after about 4 weeks, we have water in our kitchen sink. You can see our new Grohe faucet, air vacuum switch for the garbage disposal, and soap dispenser.


If you look closely, you can see our new appliance garage to hide things in. There's just one problem with it though.


Our appliances are just a tad too tall for it. Hopefully they'll be able to work something out so they fit.


Here you can see they fixed the microwave opening by moving one of the cabinets. 30" on the dot.


Here's our backsplash tile. We removed some of the outlier tiles that are part of what makes natural stone so "beautiful".

Friday, December 09, 2005

Day 20. Granite!

Finally the granite is installed. Luckily they didn't break any of the slabs because we didn't have any spares.


We are still missing most of our appliances as well as plumbing. Hopefully those will roll in next week.


In case you were wondering how they cut your sink holes. It helps to have the right drill bit.


Since the overhang is more than 12", they recommend extra support. Originally these bars should have been routed into the subdeck, but for some reason no bars were present in the subdeck or the granite. So our kitchen contractor found these after a quick trip to home depot. It's not the most attractive but only little kids will be able to see them. Hopefully no one's knees hit them either.


Here's a shot of them attaching the granite to the subdeck. The white spots are just latex caulk and if you look closely there are these plastic spaces to make the surface level. Overall most of our granite is only touching the subdeck in a few places.

Thursday, December 08, 2005

Day 19. And the answer is....

If you guessed number 3, then you were right. Here's a picture of Mango Coax Nuage by LBL Lighting.

Can you tell what's missing? The phone jack has been moved into the cabinet in case anyone needs it. Who actually uses a landline these days anyways. Other things finished today were the island outlet, the 4 outlets under the sink, and some touch ups on the molding. Granite is tomorrow.

Wednesday, December 07, 2005

Day 18. A little light please

First off, can you guess what this picture means?

Well since the microwave is 30", it means one of the cabinets needs to move over an 1/8" in order for the microwave to fit.

A fresh coat of paint where the soffits use to be.

Too bad these cabinets will have to move slightly.

Finally some lights.



A shot of the undercabinet lights. Each one is 10 watts.


Here's the transformer (300W) mounted under the sink.

Tuesday, December 06, 2005

Day 17. The strike is over




Okay just kidding. There was no strike but there hasn't been any work for the last week. Appliances were delivered today with the Fridge plugged in. Tilt out trays were installed in the sink base. The base should have been installed with it originally but some how it was ordered without them. Also the hall base arrived and was installed. The drawers and roll outs still need to be installed. The pendant lights arrived over the weekend. They look pretty cool.

Wednesday, November 30, 2005

Day 12. Screws Happen!

So just when you think everything is going smoothly, something always goes wrong. We get a call from our contractor and they can't find any granite slabs on hold for us. Turns out our slabs were released and some of them already sold. Luckily we were able to find some other slabs that we liked.


And today we just noticed that the screws used to hold the undercabinet lighting up were actually just a tad too long for some of the cabinets. You can see here a screw punching through. You'd think they've done this enough to know which length screw to use so this doesn't happen.

Monday, November 28, 2005

Day 11. Now you see them, now you don't

Chester rolling in the future home of the dishwasher.


Some people have actually thought that I've done most of this work myself. One thing that I've learned from school is that outsourcing is the preferred operational strategy when you don't have the capabilities internally. I did however do some very handy HVAC work.
So in case you didn't notice, there are no more wires hanging from the walls. The undercabinet wiring was installed.
Here you can see the light modules installed on the wire track. No bulbs though.
Here's just the wire track. The granite fabricators came and did a template of the countertops. Essentially they just retook measurements so that they can fabricate the counters.

Here' s a picture of the Omega cabinets. You can see the double undermounted roll outs.