Tuesday, November 13, 2012

Backyard work - Week 3

DSC_2527
The majority of week 3 was doing the landscaping (plants, irrigation, lights, etc).

IMG_1533
Here are the plants after being delivered.

IMG_1534
Here are all the succulents.

DSC_2448
We had 2 more control valves added so we could control the garden planter independently from the trees and plants. The one pipe going to the right is actually the water supply for the BBQ island sink.

IMG_1524
Here's how the irrigation lines feed into the two different planter beds.

IMG_1518
This is the french drain for the sink.

DSC_2488
Here are all the plants in the front prior to planting. We had them place them and then we fined tuned the placement before getting planted. Even with that, we had to have them move a few after being planted in the ground.

DSC_2495
Makes planting in hard rock much easier.

DSC_2532
Here's the after picture for the front. Notice the river rock bed which is actually functional since the gutter downspout feeds into it.

DSC_2471
Here are the copper scuppers for the pool water feature.

DSC_2526
The BBQ island being framed out of metal.

DSC_2538
Cement board then covers the metal frame.

DSC_2490
The side path is being finished in cement pavers.

DSC_2530
Here's our new water line tile.

DSC_2544
Here's a picture of the back with all the plants planted.

DSC_2536
Here's the front side. We had them add a little river rock bed to cover the drain from the gutters.