Sunday, January 27, 2013

Rainbow

It's not often you see one of these in AZ.

Sunday, January 20, 2013

Picnic at the Farm

Friday, January 11, 2013

Christmas 2012

DSC_2984
After Santa arrived. Note Santa doesn't wrap his gifts.

DSC_2729_mod
The kids are helping out with hanging the lights on the house. I had them attach plastic hangers to each bulb.

DSC_2973
Hanging out at the Zoo on Christmas Eve.

DSC_2998
They are checking out the plate of cookies left for Santa on Christmas morning.

DSC_2991
Santa even had time to write a little thank you note.

DSC_2999
They spotted Santa's gifts.

DSC_3010_cr
Note, not all the gifts are for the kids.

DSC_3065
Dundun dundun dundun

Friday, December 21, 2012

Tennis anyone?

Untitled
I took Lauren to play tennis for the first time. We spent most of the time chasing down balls but not too bad for her first time. Hopefully she'll want to keep playing.

Thursday, December 20, 2012

Winter Break

Untitled

Sunday, December 09, 2012

Morning hike

Untitled

Wednesday, December 05, 2012

Sick day at home

DSC_2772
Someone was a little tired....


DSC_2771
or just pretending to be.

Thursday, November 22, 2012

Classic Tonka

They don't make Tonkas like this anymore. Cole will be pretty excited.

Monday, November 19, 2012

Backyard work - Week 4

DSC_2584
Work has slowed down quite a bit this past week. The BBQ island finished up. The grill consists of a 32" Summerset TRL grill and double side burner. The island has two low voltage lights that can be switched off. The drawers below the grill also includes a pull out trash can. The only thing left is to paint the stucco to match the house color.

DSC_2582
The scabos split faced tile was added to the water feature as well as the fire pit.

DSC_2583
The scabos looks a little dark here because it was wet.

DSC_2576
On the side yard, we switched the lights to path lights. In hindsight, it probably would have been fine to leave them the same as our little hat area lights.

DSC_2575
Here's our fake grass. They still need to come back and lower the back corner just a little bit.

Tuesday, November 13, 2012

Backyard work - Week 3

DSC_2527
The majority of week 3 was doing the landscaping (plants, irrigation, lights, etc).

IMG_1533
Here are the plants after being delivered.

IMG_1534
Here are all the succulents.

DSC_2448
We had 2 more control valves added so we could control the garden planter independently from the trees and plants. The one pipe going to the right is actually the water supply for the BBQ island sink.

IMG_1524
Here's how the irrigation lines feed into the two different planter beds.

IMG_1518
This is the french drain for the sink.

DSC_2488
Here are all the plants in the front prior to planting. We had them place them and then we fined tuned the placement before getting planted. Even with that, we had to have them move a few after being planted in the ground.

DSC_2495
Makes planting in hard rock much easier.

DSC_2532
Here's the after picture for the front. Notice the river rock bed which is actually functional since the gutter downspout feeds into it.

DSC_2471
Here are the copper scuppers for the pool water feature.

DSC_2526
The BBQ island being framed out of metal.

DSC_2538
Cement board then covers the metal frame.

DSC_2490
The side path is being finished in cement pavers.

DSC_2530
Here's our new water line tile.

DSC_2544
Here's a picture of the back with all the plants planted.

DSC_2536
Here's the front side. We had them add a little river rock bed to cover the drain from the gutters.

Monday, November 12, 2012

Legos anyone?

DSC_2442_mod_cr
Lauren and Cole's school has a fundraiser every year where the classrooms put together a gift basket and then sell raffle tickets to win them. We usually never win but this year we hit the jackpot. The "Lego" basket is coveted by many of the elementary kids and much to our surprise we won. Cole put in just 3 tickets.

Thursday, November 08, 2012

Surround sound

IMG_1490
With sabbatical coming to an end, we've been busy trying to finish all the projects we had planned during our time off. Installing in ceiling speakers however, was not one of them. We had an energy audit done and as a resulted added installation to our attic along with some other improvements. Since I didn't want to be climbing in the attic after the extra insulation was put in, this project moved quickly to the top of the list. Here's one of the speakers before getting installed.

IMG_1491
Here's the speaker after getting wrapped in quilt batting. This is to prevent any insulation from coming in contact with the speaker.

IMG_1487
Bought some speaker cable from monoprice. Definitely the cheapest price for wire.

IMG_1488
Here are the four runs before fishing them through the wall and up in to the attic.

IMG_1536
I only had to make one cut in the wall so that I could drill through a 2" x 4" fire blocking.

DSC_2474
Here are the two new surround speakers in the family room.

DSC_2472
Here are the new outdoor speakers over our patio. Total time spent was probably ~7-8 hours which included fishing the speakers wires through the wall and up through the attic.

Monday, November 05, 2012

Backyard work - Week 2

DSC_2355
Since the kids love going to the beach so much, we decided to put in a huge sandbox. Okay not really. The sand is a base for the travertine pavers. Luckily the kids didn't see all the sand.

DSC_2361
Here's the far side of the patio where the fire pit and the barbecue island are going to go. You can see the gas riser and the electrical and plumbing facilities.

DSC_2363
Here are the pavers before they sanded and compressed them down further.

DSC_2332
Here's the pool coping edge. We kept the old pool deck so they have to cover it still. The advantage is that you avoid all the labor to demo the concrete decking but you raise your deck by 2" and you have this extra 4" tile on the side.

DSC_2391
Here's the increased patio area.

DSC_2395
We put in stepping stones to the back where we are hopefully going to build a garden planter.

IMG_1457
The kids enjoyed playing on the mounds of rock.

DSC_2397
More stepping stones along the side.

DSC_2393
Here's the 4" tile facing that hides the old concrete deck. Water line tile will go below that.

DSC_2387
Here's the path along the side of the house.

DSC_2237
Here's the start of the fire pit. You can see the gas riser. We actually had them move it another foot the following day.

DSC_2276

DSC_2405
Here's the fire pit with the travertine cap. Still need to put the stone on the side.

DSC_2338
The pool column was finally removed and here's part of the water feature. They still need to add another layer of block on top. They are actually expecting to finish in another week.