


Okay just kidding. There was no strike but there hasn't been any work for the last week. Appliances were delivered today with the Fridge plugged in. Tilt out trays were installed in the sink base. The base should have been installed with it originally but some how it was ordered without them. Also the hall base arrived and was installed. The drawers and roll outs still need to be installed. The pendant lights arrived over the weekend. They look pretty cool.
No comments:
Post a Comment